Corporate Office

Corporate Office

Global Switch
4th Floor Millbank Tower
21-24 Millbank
London SW1P 4QP
United Kingdom

+44 (0)20 7802 5150
info@globalswitch.com

Data Centres

Amsterdam

+31 (0)20 6666 300

salesamsterdam@globalswitch.com

Frankfurt

+49 (0)69 74 22 70

salesfrankfurt@globalswitch.com

Hong Kong

+852 3750 7572

saleshongkong@globalswitch.com

London

+44 (0)20 7473 9000

saleslondon@globalswitch.com

Madrid

+34 91 312 06 00

salesmadrid@globalswitch.com

Paris

+33 (0)1 55 90 04 60

salesparis@globalswitch.com

Singapore

+65 6858 5008

salessingapore@globalswitch.com

Sydney

+61 (0) 2 9566 7000

salessydney@globalswitch.com

 
 

TECHNICAL SPECIFICATION – SYDNEY EAST

Location

  • The data centre is located less than 1.5km from the financial district and city centre
  • A local metro railway station is located within a 5 minute walk. Inner city tram and bus access is readily available
  • Kingsford Smith Airport is 10km away

Building Overview

  • Global Switch owns the freehold
  • Purpose built
  • Exceeds Tier III operational performance
  • 31,000 sq m of gross space
  • 5 data floors
  • Flexible IT space with ability to create bespoke environments as required

Main Structural Features

  • Steel frame with concrete floors, metal faced cladding and glazing
  • 5.2m slab to slab height
  • Raised floor height of 1,000mm
  • Minimum from raised floor: 3.2m clear height to underside of ceiling
  • Floor loading of 15kN/m²
  • 1 goods lift (11 tonnes), 1 passenger lift

Power

  • 33kV utility supply with N+1 redundancy
  • Utility power supply capacity of 38MVA (planned)
  • Technical (IT) power and mechanical systems supplied by on-site Diesel Rotary UPS with N+2 redundancy
  • Fully diverse power distribution to technical areas
  • On-site fuel storage to support 24 hours at full capacity with 24x7x365 fuel delivery
  • Offering 1,850 W/m2 as standard, with higher density solutions fully supported

Cooling

  • 35.2MW of installed and planned cooling provision
  • Minimum N+1 resilience on all systems
  • CRAH units control temperature and humidity in technical space within the recommended range of ASHRAE TC9.9
  • Diverse distribution pipework throughout
  • Chilled water cooling system with free cooling loop
  • In rack cooling capability if required

Security

  • Operations Centre manned 24x7x365
  • Security guard patrols 24x7x365
  • Continuous CCTV surveillance of external and internal areas
  • CCTV records kept for 31 days
  • Comprehensive intruder detection and alarms to all areas
  • Strict access control procedures to ISO 27001:2013

Security (continued)

  • Access control using proximity card readers and biometric systems
  • Physical access via mantrap
  • Secure managed delivery and loading area available 24x7x365
  • Secure staging available, if required

Connectivity

  • Carrier Neutral
  • Network dense with access to multiple global and regional carriers and Internet service providers offering Dark Fibre, Wavelength, Ethernet, MPLS, VPLS, IP Transit, Peering, CDN, Storage, Virtualised Services (SDN), Voice, Mobile Services
  • Access to multiple cloud services through leading public, private and hybrid cloud solution providers
  • 2 dedicated Meet Me Rooms
  • 4 diverse building entry points
  • Diverse cable routes and pathways
  • Campus fibre system interconnecting Sydney East to Sydney West
  • Roof space availability for satellite and antennae equipment
  • PipeIX present

Fire Detection and Suppression

  • Analogue addressable fire detection system in all areas
  • Aspirated early warning smoke detection system (monitored 24x7x365)
  • Inergen gas suppression system in technical areas with dry pipe pre-action sprinkler for additional resiliency

Critical Environments Management

  • Experienced 24x7x365 facilities management team
  • Environment (thermal conditions) monitored 24x7x365
  • All Building Management Systems (BMS) monitored 24x7x365
  • Comprehensive energy metering systems
  • Internationally recognised critical environments programme

Other Services

  • Cross connects
  • Customer reports
  • Deliveries and storage
  • Design and build
  • Fit out
  • On-site facilities
  • Remote hands
  • Technical cleaning and waste disposal

Certifications

  • ISO 9001:2008, 14001:2004, 27001:2013
  • OHSAS 18001:2007

Technical specification relates to the completion of all stages of Sydney East

Tech spec download button